We at Quantum Mouldings Limited always strive to deliver quality
products that meet or exceed
customer expectations and satisfaction.
Management demonstrates its commitment to this policy by doing
the following:
meeting all statutory and regulatory requirements of ISO
9001:2000, and continually improving quality, service, costs and
technology.
Management Reviews of operational and business performance data,
customer satisfaction surveys, audit results and the results of
corrective and preventive actions are used to assess the
effectiveness of the system and identify areas of continual
improvement activities.
The Quality Policy, Quality Assurance Manual (QAM) and the
accompanying Quality Control Procedures are therefore regularly
reviewed and improved.
Standards set by Quantum Mouldings Limited. are achieved by
adhering to a stringent Quality Assurance System that conforms
to the requirements of ISO 9001:2000 (and any subsequent
amendments) and those imposed by our customers including
P.P.A.P, APQP, and 8D Principles.
Production Part Approval Process:
The Production Part Approval Process (PPAP) outlines the methods
used for approval of production and service commodities,
including bulk materials, up to and including part submission
warrant in the Advanced Quality Planning process. The purpose of
the PPAP process is to ensure that suppliers of components
comply with the design specification and can run consistently
without affecting the customer line and improving the quality
systems. PPAP ensures that you will achieve the first time
quality and will lower down the cost of quality.
Advanced Production Quality Planning Phase 1 - Plan &
Define Programme - determining customer needs, requirements &
expectations using tools such as QFD review the entire
quality planning process to enable the implementation of a
quality programme how to define & set the inputs & the outputs.
Phase 2 - Product Design & Development - review the
inputs & execute the outputs, which include FMEA, DFMA, design
verification, design reviews, material & engineering
specifications. Phase 3 - Process Design &
Development - addressing features for developing manufacturing
systems & related control plans, these tasks are dependent on
the successful completion of phases 1 & 2 execute the outputs.
Phase 4 - Product & Process Validation - validation of
the selected manufacturing process & its control mechanisms
through production run evaluation outlining mandatory production
conditions & requirements identifying the required outputs.
Phase 5 - Launch, Feedback, Assessment & Corrective
Action - focuses on reduced variation & continuous improvement
identifying outputs & links to customer expectations & future
product programmes. Control Plan Methodology -
discusses use of control plan & relevant data required to
construct & determine control plan parameters stresses the
importance of the control plan in the continuous improvement
cycle.
Eight Disciplines
The 8D Process is a problem solving method for product and
process improvement. It is structured into 8 steps (the D's) and
emphasizes team. This is often required in automotive
industries. The 8 basic steps are:
D#1 - Establish the
Team D#2 - Describe the problem. D#3 - Develop an
Interim Containment Action D#4 - Define / Verify Root Cause
D#5 - Choose / Verify Permanent Corrective Action D#6 -
Implement / Validate Permanent Corrective Action D#7 -
Prevent Recurrence D#8 - Recognize the Team
|